|
Monday, September 17 the concrete blocks for the garage
foundation arrive. A second truck had to be called to
help unload because of an hydraulic failure on the first
truck.
 |
|
The blocks stacked
up in the middle of the garage area, ready for
the mason.
|
Next: The foundation
is laid
Return to
the main project Page
|