Foundation Excavation:
On Thursday, September 13, Malinda got a call in Gaithersburg
that the excavation company was on their way out to
Thistletop.
|
|
|
The backhoe begins
to dig the trench around the outline of the garage.
|
|
|
|
Thistletop sits
on the top of a rocky ridge. A small dynamite
charge was needed to dislodge a stubborn chunk
of rock.
(Click on the image to see a larger (52K) version
where you can see some dust and debris flying
as the charge goes off.)
|
|
|
|
The trench having
been dug, the concrete footers are poured into
the trench to support the concrete block foundation.
|
|
|
|
|
Pouring concrete
...
|
... and filling
the trench.
|
Next: The concrete blocks
arrive