The next step is the building of the forms and the
pouring of the foundation - more concrete!
|
|
|
The forms for
the foundation are built out of pre-formed aluminum
elements which go up much quicker than trying
to put them together with plywood.
|
|
|
|
The crew scampers
around the top of the foundation walls which
are only about 9-inches wide, with a 9-foot
drop on either side.
|
|
|
|
Then the first
of four concrete trucks come in and deposit
thier load.
|
|
|
|
While the concrete
is being poured into the forms, the crew moves
around and distributes the concrete evenly.
|
|
|
|
At the end of
the day, all that is left is for the concrete
to set so the walls will stand on their own when
the forms are removed.
|