|
Ground was broken for the house excavation on November
7!
|
|
|
This view of the
building site was taken from the level of the
garage attic floor.
|
|
|
|
At the end of
the first day, the topsoil had been removed ...
|
|
|
|
... and it was
now ready to bring in the heavy equipment.
|
|
|
|
By the end of
the week, it became apparent that there was more
than just plain dirt below the surface.
|

|
|
The house sits
on top of a rocky ridge and, sure enough, about
3 feet down the ridge became apparent through
the middle of the basement.
|
Next: Hoe Ram
Return to
the main project Page
|